Northwood Stable

Client: Seymour Equine Services Duration: July 2024 – August 2024 Project Value: $145k Steel Tonnage: 1.7t Project Scope:  The project involved all of the companies within the CG&C Group. GMCE completed the engineering and design with Connex completing the shop drawings. Due to the extremely tight timeframes on the project, the group’s accelerated design process was used (completing […]

Northwood Stable Read More »

Webb Street Level Crossing Removal Project (Narre Warren Station)

Client: Built Environs Duration: April 2023 – June 2024 Project Value: $10.8m Steel Tonnage: 575t Project Scope:  CG&C Group businesses GMCE, Connex, CPE Construction, and Concept Rigging were engaged to complete the structural steel and platform cladding packages, The total value of work completed was $10.8m and included 575t of steel, Connex completed the shop drawings, whilst

Webb Street Level Crossing Removal Project (Narre Warren Station) Read More »