Greater Shepparton College

Client: Hansen Yuncken Duration: July 2020 – February 2021 Project Value: $1.1m Steel Tonnage: 265t Project Scope:  The project involved the supply and installation of structural steel for three buildings as part of the new Greater Shepparton College. This project involved tight timeframes and coordination with the client and other subcontractors. CPE Construction was able to deliver a high […]

Greater Shepparton College Read More »

NVE Warehouses

Client: North Vic Engines Duration: October 2021 – November 2022 Project Value: $9.75K Steel Tonnage: 47t Project Scope:  The project included the engineering design, shop drawings, structural steel, and cladding installation of two new warehouses. This project was locally based in Cobram and CPE Construction was happy to provide two new quality warehouses for another local business. It was

NVE Warehouses Read More »

Foott Warehouse

Client: Foott Duration: June 2021 – July 2022 Project Value: $1.66m Steel Tonnage: 130t Project Scope: The project involved the shop drawings, structural steel and cladding of a new 3,750m2 warehouse for Foott. CPE Construction has had significant experience in successfully delivery warehouses of this nature, and it was no different on this project. This was another project being delivered

Foott Warehouse Read More »

Bonbeach Station

Client: Southern Program Alliance Duration: April 2021 – October 2022 Project Value: $5.4m Steel Tonnage: 300t Project Scope:  The project was a significant undertaking for CPE Construction and largest project to date. The project included the structural steel supply and installation of two lift shafts, platform stairs, station buildings, overpass, platform steel, metal works and various other miscellaneous packages.

Bonbeach Station Read More »

Gippsland Line Upgrade

Client: Vic Connect Duration: April 2022 – May 2023 Project Value: $2.19m Steel Tonnage: 56t Project Scope:  The project included the structural steel and cladding of the platform canopies and stairs at Bunyip, Longwarry and Morwell stations. With the project based in Gippsland, it proved a logistical challenge to complete this job, especially due to the frequency of wet

Gippsland Line Upgrade Read More »

Northwood Stable

Client: Seymour Equine Services Duration: July 2024 – August 2024 Project Value: $145k Steel Tonnage: 1.7t Project Scope:  The project involved all of the companies within the CG&C Group. GMCE completed the engineering and design with Connex completing the shop drawings. Due to the extremely tight timeframes on the project, the group’s accelerated design process was used (completing

Northwood Stable Read More »

Webb Street Level Crossing Removal Project (Narre Warren Station)

Client: Built Environs Duration: April 2023 – June 2024 Project Value: $10.8m Steel Tonnage: 575t Project Scope:  CG&C Group businesses GMCE, Connex, CPE Construction, and Concept Rigging were engaged to complete the structural steel and platform cladding packages, The total value of work completed was $10.8m and included 575t of steel, Connex completed the shop drawings, whilst

Webb Street Level Crossing Removal Project (Narre Warren Station) Read More »

Mount Derrimut Road Level Crossing Removal Project (Deer Park Station)

Client: Built Environs Duration: October 2022  to October 2023 Project Value: $5.2 million Steel Tonnage: 215t Project Scope:  CG&C Group businesses CPE Construction and Concept Rigging were engaged to complete the buildings steel, stairs and ramps steel, and stair cladding works. Of significance in this package was the fabrication and installation of the Bunjil Canopy, The architectural complexity involved

Mount Derrimut Road Level Crossing Removal Project (Deer Park Station) Read More »

Greenhams Tongala

Client: CAF Build Duration: April 2023 to November 2023 Project Value: $1.3 million Steel Tonnage: 39t Project Scope:  CG&C Group businesses Connex, CPE Construction and CGC Site Services were engaged to complete upgrade works to the Greenham Tongala Facility, One part of the scope involved the installation of a new cow race and CG&C Group was given the target of

Greenhams Tongala Read More »

Shepparton Corridor Upgrade

Client: Coleman Rail Duration: September 2021 – November 2023 Project Value: $4.8 million Steel Tonnage: 90t Project Scope:  CG&C Group businesses Connex, CPE Construction, and CGC Site Services were engaged to complete the structural steel and building packages at the Shepparton Stabling as well as some other minor packages across the project. The Shepparton Stabling Yard works were part

Shepparton Corridor Upgrade Read More »