Ballarat Line Upgrade

Client: Lendlease Engineering / Coleman Rail JV

Duration: July 2018 – January 2020

Project Value: $7.3 Million

Project Scope:  

Supply, fabrication and installation works along the Ballarat to Melbourne Rail Line, including: structural steel, insulated panel roofing, perforated aluminium cladding, fibre cement sheeting and aluminium cassette cladding.

Initially brought on board to provide structural steel for Rockbank, the first of five station rebuilds, CPE ended up a preferred sub-contractor, working on all five station builds, and taking responsibility for multiple facets of the project. Simultaneously working with separate construction and project management teams across all 5 builds in the line upgrade. CPE were able to offer an integrated solution, with a single point of contact. The crew were able to streamline the process of installing structural steel, PIR panels and multi-cell fibreglass wall sheets and skylights to both meet a demanding timeframe and provide a quality finish to an architectural focal point of the campus.

Scroll to Top