Client: John Holland
Duration: December 2020 – April 2021
Project Value: $0.9 Million
Project Scope:
Structural Steel and Roofing works for new Depot to enable Bell – Preston project main works. Depot included office/amenites multilevel walkway, workshop and ancillary structures.
CPE’s ability to work across multiple trades was instrumental in keeping the broader project on schedule. With multiple design changes late in the project and operating within a very tight site to place a 2 level structural steel walkway between 4x insitu structures, CPE’s ability to provide solutions on the go and complete the entire structure (steel, flooring, balustrading, roofing and cladding) enabled program effects to be minimised and works to be accelerated wherever possible.