Our Projects
Click on the images below for more information on each project
2024

Northwood Stable
Client: Seymour Equine Services Duration: July 2024 – August 2024 Project Value: $145k Steel Tonnage: 1.7t Project Scope: The project involved all of the companies within the CG&C Group. GMCE completed the engineering and design with Connex completing the shop drawings. Due to the extremely tight timeframes on the project, the group’s accelerated design process was used (completing

Webb Street Level Crossing Removal Project (Narre Warren Station)
Client: Built Environs Duration: April 2023 – June 2024 Project Value: $10.8m Steel Tonnage: 575t Project Scope: CG&C Group businesses GMCE, Connex, CPE Construction, and Concept Rigging were engaged to complete the structural steel and platform cladding packages, The total value of work completed was $10.8m and included 575t of steel, Connex completed the shop drawings, whilst
2023

Gippsland Line Upgrade
Client: Vic Connect Duration: April 2022 – May 2023 Project Value: $2.19m Steel Tonnage: 56t Project Scope: The project included the structural steel and cladding of the platform canopies and stairs at Bunyip, Longwarry and Morwell stations. With the project based in Gippsland, it proved a logistical challenge to complete this job, especially due to the frequency of wet

Mount Derrimut Road Level Crossing Removal Project (Deer Park Station)
Client: Built Environs Duration: October 2022 to October 2023 Project Value: $5.2 million Steel Tonnage: 215t Project Scope: CG&C Group businesses CPE Construction and Concept Rigging were engaged to complete the buildings steel, stairs and ramps steel, and stair cladding works. Of significance in this package was the fabrication and installation of the Bunjil Canopy, The architectural complexity involved

Greenhams Tongala
Client: CAF Build Duration: April 2023 to November 2023 Project Value: $1.3 million Steel Tonnage: 39t Project Scope: CG&C Group businesses Connex, CPE Construction and CGC Site Services were engaged to complete upgrade works to the Greenham Tongala Facility, One part of the scope involved the installation of a new cow race and CG&C Group was given the target of

Shepparton Corridor Upgrade
Client: Coleman Rail Duration: September 2021 – November 2023 Project Value: $4.8 million Steel Tonnage: 90t Project Scope: CG&C Group businesses Connex, CPE Construction, and CGC Site Services were engaged to complete the structural steel and building packages at the Shepparton Stabling as well as some other minor packages across the project. The Shepparton Stabling Yard works were part
2022

NVE Warehouses
Client: North Vic Engines Duration: October 2021 – November 2022 Project Value: $9.75K Steel Tonnage: 47t Project Scope: The project included the engineering design, shop drawings, structural steel, and cladding installation of two new warehouses. This project was locally based in Cobram and CPE Construction was happy to provide two new quality warehouses for another local business. It was
2021

Seed Force Shepparton
Client: Seed Force Duration: 1 year Project Value: $2.5 million Project Scope: Provision of construction services from concept design all the way through to hand over for a brand new seed processing and storage facility in Shepparton. Facilities included storage/packing area, loading bays, offices, plant rooms and processing area. As part of CPE’s management services,

Legacy Packing Facility
Client: Legacy Packing Duration: 3 years Project Value: $3.5 million Project Scope: Provision of construction services from concept design all the way through to hand over for a brand new fruit packing facility in Cobram. Facilities included storage/packing area, loading docks, offices, plant rooms and cool room storage. CPE worked successfully with Legacy to deliver
2020

Greater Shepparton College
Client: Hansen Yuncken Duration: July 2020 – February 2021 Project Value: $1.1m Steel Tonnage: 265t Project Scope: The project involved the supply and installation of structural steel for three buildings as part of the new Greater Shepparton College. This project involved tight timeframes and coordination with the client and other subcontractors. CPE Construction was able to deliver a high

Wangaratta Coachlines
Client: Wangaratta Coachlines Duration: December 2019 – August 2020 Project Value: 3 million Project Scope: CPE Constructed a 2150sqm Bus Coach storage Shed and Double Story OfficeBuilding facility. CPE was engaged to construct the full project including detailed concrete footings, structural steel fabrication/erection, Wall/roof cladding, Internal/external doors, commercial windows, precast concrete panel perimeter walls, Askin

Victorian Tunnel Training Centre
Client: Intrec Management Duration: September 2019 – June 2020 Project Value: $2.2 Million Project Scope: Australia’s tunneling infrastructure is positioned to boom in the coming decades under significant government investment. To To skill up thousands of future Australian tunnel workers, CPE was awarded the D&C contract to engineer and build 2x replica tunnels. The two

Laminex Development Thurgoona
Client: Aaron Brain Investments Duration: November 2019- August 2020 Project Value: 2.5 million Project Scope: CPE Constructed a 3000sqm storage shed facility with a 750sqm side awning and a 150sqm single story office building facility CPE was engaged to project manage the full build along with sub trades from detailed planning, storm water design, earth

GV Health Shepparton Upgrade
Client: Lend Lease Duration: June 2018 – June 2020 Project Value: $3.5 million Project Scope: Structural Steel and Roofing works for site wide upgrades to increase patient capacity at the Goulbourn Valley Health Hospital in Shepparton. Upgrades included extensions to the Central Energy Plant, Dialysis and Emergency Departments. A brand new 5 storey Intensive Care